6 MW Wind operating in Grays Harbor, WA
6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2010
Operating Since
Coordinates
46.7931, -124.0657
County
Grays Harbor, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Coastal Community Action Program | — | — |
| Owner(s) | Coastal Community Action Program | — | — |
| Status | Operating | — | — |
The Coastal Energy Project is a 6 MW wind power plant located in Grays Harbor County, Washington. The plant began operating in 2010 and is owned and operated by Coastal Community Action Program. It consists of a single onshore wind turbine generator. The plant utilizes a GE Wind GE1.5-77 model turbine, which has a rotor diameter of 77 meters and a hub height of 80 meters.
The Coastal Energy Project operates within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year of data, the plant generated 11,644 MWh of electricity, achieving a capacity factor of 22.2%. The plant's generating capacity ranks it as the 23rd largest of 24 wind plants in Washington, and 1207th largest of 1424 wind plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.2K MWh
Latest Month
11.6K MWh
Annual Generation
22.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $11.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Coastal Energy ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo