Query
Coastal Energy Project
Type
Entity Briefing
Entity
Coastal Energy Project
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Coastal Energy Project

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

6 MW
Capacity
Operating
Current status
2010
Operating since
1
Generators
22.2%
Capacity factor
12 GWh
Annual generation
Briefing/plantOperating

Coastal Energy Project is a 6 MW Onshore Wind Turbine asset in Washington, currently Operating.

Coastal Energy Project is reported in Washington since 2010 under Coastal Community Action Program. Available operating and financial measures include 22.2% capacity factor and 12 GWh annual generation; $1895/kW reported CapEx.

Location
Grays Harbor, Washington
Technology
Onshore Wind Turbine
Owner / parent
Coastal Community Action Program
Operator
Coastal Community Action Program
Grid
Bonneville Power Administration
Plant ID
57756

What stands out

1

Coastal Energy Project is a 6 MW Onshore Wind Turbine asset in Washington with status Operating.

2

Latest annual operating measures report 22.2% capacity factor and 12 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#23 of 24
National rank
#1229 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.