Search plants, projects, owners, and states
16.2 MW Natural Gas operating in New London, CT
16.2 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
2010
Operating Since
Coordinates
41.4731, -71.9606
County
New London, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Foxwoods Resort Casino | — | — |
| Owner(s) | Foxwoods Resort Casino | — | — |
| Status | Operating | — | — |
Foxwoods CoGen is a 16.2 MW natural gas-fired combined cycle power plant located in New London County, Connecticut. The plant began operating in 2010 and is owned and operated by Foxwoods Resort Casino. It consists of three generators.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of reported data, Foxwoods CoGen generated 10,820 MWh of electricity, achieving a capacity factor of 7.6%. The plant is ranked 19th out of 49 power plants in Connecticut by capacity, and 1356th nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
983 MWh
Latest Month
10.8K MWh
Annual Generation
7.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
648 lb/MWh
NOx
2 lb/MWh
SO₂
0.003 lb/MWh
CH₄
0.012 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
7.6%
Annual Net Gen
11 GWh
CO₂eq
649 lb/MWh
Subregion
NPCC New England
2013
$965/kW
Est. Construction Cost
Total estimated cost: $15.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Secrec Substation · 69 kV
Substation Distance
< 10 km
Operator
Connecticut Municipal Electric Energy Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.CONNECTICUT
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Foxwoods CoGenForward forecasts, scenario decomposition, and risk-decision tooling for this asset.