Search plants, projects, owners, and states
20.5 MW Conventional Hydroelectric (2 MW) + Petroleum Liquids (19 MW) operating in New London, CT
20.5 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Conventional Hydroelectric + Petroleum Liquids
1919
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
41.5547, -72.0430
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
New London, CT
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
1 mapped line section connects the two facilities over 2.265 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FirstLight Power Resources Services LLC | — | — |
| Owner(s) | FirstLight Hydro Generating Company | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Tunnel power plant, located in New London County, Connecticut, is a hybrid facility utilizing both conventional hydroelectric and petroleum liquid technologies. It has a total capacity of 20.5 MW distributed across 3 generators. The plant began operating in 1919 and is owned and operated by FirstLight Power Resources Services LLC. Tunnel is ranked as the 4th largest of 14 hydroelectric plants in Connecticut, and 480th nationally out of 1464 similar facilities.
Tunnel's primary fuel source is water (WAT). In the most recent year of reported data, the plant generated 7,722 MWh, resulting in a capacity factor of 4.3%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
329 MWh
Latest Month
7.7K MWh
Annual Generation
4.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.132 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.002 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
6.6%
Annual Net Gen
12 GWh
CO₂eq
0.147 lb/MWh
Subregion
NPCC New England
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $47.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Tunnel Substation · 115 kV
Substation Distance
0.086 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.TUNNEL 23 TUNN
Pricing Hub
.Z.CONNECTICUT
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesOxy Renewable Energy queue pipeline — 1 projects by technology and status
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ISO New England
Summary analysis with parallel narrative sections and visualizations.
Hydro Plant
Data tables and metrics from the InfraSure database.
Oxy Renewable Energy queue pipeline — 1 projects by technology and status
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.