Search plants, projects, owners, and states
15 MW Solar operating in Fresno, CA
15 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2011
Operating Since
Coordinates
36.3955, -120.1078
County
Fresno, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pacific Gas & Electric Co. | Pacific Gas and Electric | — |
| Owner(s) | Pacific Gas & Electric Co. | — | — |
| Status | Operating | operating | — |
Five Points Solar Station is a 15 MW solar photovoltaic power plant located in Fresno County, California. The plant began operating in 2011 and has one generator. Pacific Gas & Electric Co. is the owner and operator. The primary fuel source is solar energy. The solar array uses a fixed-tilt tracking system. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Five Points Solar Station generated 15,412 MWh of electricity, resulting in a capacity factor of 11.7%. The plant ranks 212nd out of 862 solar plants in California and 1674th out of 7108 solar plants nationally. Financial data indicates an installed cost of $3,635.26 per kW.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
638 MWh
Latest Month
15.4K MWh
Annual Generation
11.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Solar photovoltaic · PACIFIC GAS AND ELECTRIC COMPANY · Data from 2011–2024
$3,665/kW
Installed Cost
$20.3/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
SCHLNDLR_7_N002
Pricing Hub
TH_NP15_GEN-APND
Alt. Hub / Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Five Points Solar StationForward forecasts, scenario decomposition, and risk-decision tooling for this asset.