Query
Five Points Solar Station
Type
Entity Briefing
Entity
Five Points Solar Station
Generated
2026-10-11T03:37:01.941Z

Briefing on Five Points Solar Station

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
15 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
11.7%
Capacity factor
15 GWh
Annual generation
Briefing/plantOperating

Five Points Solar Station is a 15 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Five Points Solar Station is reported in California since 2011 under Pacific Gas & Electric Co.. Available operating and financial measures include 11.7% capacity factor and 15 GWh annual generation; $3665/kW reported CapEx.

Location
Fresno, California
Technology
Solar Photovoltaic
Owner / parent
Pacific Gas & Electric Co.
Operator
Pacific Gas & Electric Co.
Grid
CAISO (California)
Plant ID
57498

What stands out

1

Five Points Solar Station is a 15 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 11.7% capacity factor and 15 GWh annual generation.

3

Available financial measures include $20.3/MWh OpEx, $3665/kW CapEx.

4

Latest linked story: “Fresno County will be site of CA’s largest solar project. How it impacts residents” (Fresno Bee, 2025-07-27).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#285 of 992
National rank
#1999 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.