Five Points Solar Station is a 15 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
Five Points Solar Station is reported in California since 2011 under Pacific Gas & Electric Co.. Available operating and financial measures include 11.7% capacity factor and 15 GWh annual generation; $3665/kW reported CapEx.
- Location
- Fresno, California
- Technology
- Solar Photovoltaic
- Owner / parent
- Pacific Gas & Electric Co.
- Operator
- Pacific Gas & Electric Co.
- Grid
- CAISO (California)
- Plant ID
- 57498
What stands out
Five Points Solar Station is a 15 MW Solar Photovoltaic asset in California with status Operating.
Latest annual operating measures report 11.7% capacity factor and 15 GWh annual generation.
Available financial measures include $20.3/MWh OpEx, $3665/kW CapEx.
Latest linked story: “Fresno County will be site of CA’s largest solar project. How it impacts residents” (Fresno Bee, 2025-07-27).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #285 of 992
- National rank
- #1999 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.