Query
Five Points Solar Station
Type
Entity Briefing
Entity
Five Points Solar Station
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Five Points Solar Station

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

15 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
11.7%
Capacity factor
15 GWh
Annual generation
Briefing/plantOperating

Five Points Solar Station is a 15 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Five Points Solar Station is reported in California since 2011 under Pacific Gas & Electric Co.. Available operating and financial measures include 11.7% capacity factor and 15 GWh annual generation; $3665/kW reported CapEx.

Location
Fresno, California
Technology
Solar Photovoltaic
Owner / parent
Pacific Gas & Electric Co.
Operator
Pacific Gas & Electric Co.
Grid
CAISO (California)
Plant ID
57498

What stands out

1

Five Points Solar Station is a 15 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 11.7% capacity factor and 15 GWh annual generation.

3

Available financial measures include $20.3/MWh OpEx, $3665/kW CapEx.

4

Latest linked story: “Fresno County will be site of CA’s largest solar project. How it impacts residents” (Fresno Bee, 2025-07-27).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#285 of 992
National rank
#1999 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.