23 MW Wind operating in Elmore, ID
23 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
43.0573, -115.4488
County
Elmore, ID
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Mountain Air Projects, LLC | Siemens Gamesa Renewable Energy | — |
| Owner(s) | Mountain Air Projects, LLC | MetLife; Innergex Renewable Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as MetLife; Innergex Renewable Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Desert Meadow Windfarm is a 23 MW wind power plant located in Elmore County, Idaho. The facility began operating in 2012 and is owned and operated by Mountain Air Projects, LLC. It ranks as the 11th largest wind farm in Idaho out of 34, and 1056th nationally out of 1424. The plant consists of a single generator utilizing onshore wind turbine technology.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 101 meters. The turbines were manufactured by Siemens, model SWT-2.3-101. In the most recent year of data, Desert Meadow Windfarm generated 62,882 MWh of electricity, achieving a capacity factor of 31.2%. The plant operates within the Western Electricity Coordinating Council (WECC) NERC region, and its balancing authority is the Idaho Power Company.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Idaho Power Company (IPCO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
4.4K MWh
Latest Month
62.9K MWh
Annual Generation
31.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $43.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Desert Meadow Windfarm