252 MW Wind operating in Lincoln, CO
252 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
39.4218, -103.6781
County
Lincoln, CO
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cedar Point LLC | Enbridge | — |
| Owner(s) | Cedar Point LLC, Clover US Blocker LLC | Enbridge | — |
| Status | Operating | operating | — |
Cedar Point Wind Farm is a 252.3 megawatt (MW) wind farm in eastern Colorado, United States, north of the town of Limon. It was the second largest wind facility in the state when it was completed in 2011. The electricity is being sold to Xcel Energy under a 20-year power purchase agreement.
Read more on WikipediaCedar Point Wind is a 252 MW wind power plant located in Lincoln County, Colorado. The facility began operating in 2011 and is owned by Enbridge, a Canadian company. Cedar Point LLC is the listed operator per the EIA. The plant utilizes onshore wind turbine technology, consisting of a single generator. It ranks as the 6th largest wind farm in Colorado out of 21, and 158th nationally out of 734.
The plant's turbines have a hub height of 80 meters and a rotor diameter of 90 meters. The turbines were manufactured by Vestas, model V90-1.8. In the most recent year of data, Cedar Point Wind generated 692,569 MWh of electricity, achieving a capacity factor of 31.3%. The balancing authority for the plant is Public Service Company of Colorado, and it resides within the WECC NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Public Service Company of Colorado (PSCO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
68.5K MWh
Latest Month
692.6K MWh
Annual Generation
31.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $477.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Cedar Point WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.