Query
Cedar Point Wind
Type
Entity Briefing
Entity
Cedar Point Wind
Technology
wind
Generated
2026-10-20T02:58:50.447Z

Briefing on Cedar Point Wind

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
252 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
31.3%
Capacity factor
693 GWh
Annual generation
Briefing/plantOperating

Cedar Point Wind is a 252 MW Onshore Wind Turbine asset in Colorado, currently Operating.

Cedar Point Wind is reported in Colorado since 2011 under Enbridge. Available operating and financial measures include 31.3% capacity factor and 693 GWh annual generation; $1895/kW reported CapEx.

Location
Lincoln, Colorado
Technology
Onshore Wind Turbine
Owner / parent
Enbridge
Operator
Cedar Point LLC
Grid
Public Service Company of Colorado
Plant ID
57315

What stands out

1

Cedar Point Wind is a 252 MW Onshore Wind Turbine asset in Colorado with status Operating.

2

Latest annual operating measures report 31.3% capacity factor and 693 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “Cedar Point Wind Farm” (Energy Monitor, 2014-09-23).

Market and operating context

Balancing authority
Public Service Company of Colorado
NERC region
WECC
State rank
#8 of 37
National rank
#169 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.