Cedar Point Wind is a 252 MW Onshore Wind Turbine asset in Colorado, currently Operating.
Cedar Point Wind is reported in Colorado since 2011 under Enbridge. Available operating and financial measures include 31.3% capacity factor and 693 GWh annual generation; $1895/kW reported CapEx.
- Location
- Lincoln, Colorado
- Technology
- Onshore Wind Turbine
- Owner / parent
- Enbridge
- Operator
- Cedar Point LLC
- Grid
- Public Service Company of Colorado
- Plant ID
- 57315
What stands out
Cedar Point Wind is a 252 MW Onshore Wind Turbine asset in Colorado with status Operating.
Latest annual operating measures report 31.3% capacity factor and 693 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “Cedar Point Wind Farm” (Energy Monitor, 2014-09-23).
Market and operating context
- Balancing authority
- Public Service Company of Colorado
- NERC region
- WECC
- State rank
- #8 of 37
- National rank
- #169 of 1,442
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.