Search plants, projects, owners, and states
9 MW Wind operating in Kodiak Island, AK
Outside CONUS — spatial-market dimensions not provided by this dataset.
9 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2009
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
57.7869, -152.4406
Reference point reported to EIA.
County
Kodiak Island, AK
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
Mapped facilities are available to inspect, but no route is selected.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Kodiak Electric Assn Inc | — | — |
| Owner(s) | Kodiak Electric Assn Inc | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Pillar Mountain Wind Project Microgrid is a 9 MW wind power facility located in Kodiak Island County, Alaska. The plant, which began operating in 2009, is owned and operated by Kodiak Electric Association Inc. It utilizes two onshore wind turbines manufactured by GE Wind, specifically the GE1.5-77 model. The turbines have a rotor diameter of 77 meters and a hub height of 80 meters.
The facility's primary fuel source is wind (WND). In its most recent year of operation, the Pillar Mountain Wind Project Microgrid generated 26,135 MWh of electricity, achieving a capacity factor of 33.1%. The plant is ranked as the 3rd largest of 4 wind facilities in Alaska, and 1178th out of 1424 wind facilities nationally.
Grid Region
—
Market
—
NERC Region
—
Balancing Authority
—
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Connection evidence
Connection unresolved
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.6K MWh
Latest Month
26.1K MWh
Annual Generation
33.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $17.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
BRP Aras BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Pillar Mountain Wind Project Microgrid
Data-driven briefing on Pillar Mountain Wind Project Microgrid — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.