Query
Pillar Mountain Wind Project Microgrid
Type
Entity Briefing
Entity
Pillar Mountain Wind Project Microgrid
State
MT
Technology
wind
Generated
2026-10-18T20:38:37.608Z

Briefing on Pillar Mountain Wind Project Microgrid

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
9 MW
Capacity
Operating
Current status
2009
Operating since
2
Generators
33.1%
Capacity factor
26 GWh
Annual generation
Briefing/plantOperating

Pillar Mountain Wind Project Microgrid is a 9 MW Onshore Wind Turbine asset in Alaska, currently Operating.

Pillar Mountain Wind Project Microgrid is reported in Alaska since 2009 under Kodiak Electric Assn Inc. Available operating and financial measures include 33.1% capacity factor and 26 GWh annual generation; $1895/kW reported CapEx.

Location
Kodiak Island, Alaska
Technology
Onshore Wind Turbine
Owner / parent
Kodiak Electric Assn Inc
Operator
Kodiak Electric Assn Inc
Plant ID
57187

What stands out

1

Pillar Mountain Wind Project Microgrid is a 9 MW Onshore Wind Turbine asset in Alaska with status Operating.

2

Latest annual operating measures report 33.1% capacity factor and 26 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

State rank
#3 of 4
National rank
#1199 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.