Search plants, projects, owners, and states
63 MW Wind operating in Navajo, AZ
63 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
34.6552, -110.2857
County
Navajo, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | — | — |
| Owner(s) | Avangrid Power LLC | — | — |
| Status | Operating | — | — |
Dry Lake Wind LLC is a 63 MW wind power plant located in Navajo County, Arizona. The plant began operating in 2009 and is owned and operated by Avangrid Power LLC. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Salt River Project balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
The plant's primary fuel source is wind (WND). Key engineering specifications include a wind turbine hub height of 79 meters and a rotor diameter of 88 meters. The wind turbines were manufactured by Suzlon and are model S88. In the most recent year of reported data, Dry Lake Wind generated 107,921 MWh, achieving a capacity factor of 19.6%. The plant ranks as the 7th largest wind farm in Arizona and 877th nationally out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Salt River Project (SRP)
Grid Voltage
24.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
6.7K MWh
Latest Month
107.9K MWh
Annual Generation
19.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $119.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.