103.5 MW Wind operating in Toole, MT
103.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
48.5149, -112.1205
County
Toole, MT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NaturEner Glacier Wind Energy 2 LLC | — | — |
| Owner(s) | NaturEner Glacier Wind Energy 2 LLC | — | — |
| Status | Operating | — | — |
NaturEner Glacier Wind Energy 2 is a 103.5 MW wind power plant located in Toole County, Montana. The facility, which began operating in 2009, utilizes a single generator consisting of multiple onshore wind turbines. The plant is owned and operated by NaturEner Glacier Wind Energy 2 LLC. It ranks as the 9th largest wind farm in Montana (out of 11) and 675th nationally (out of 734).
The plant's turbines are manufactured by Acciona, model AW77/1500, with a rotor diameter of 77 meters and a hub height of 80 meters. In the most recent year of data, the plant generated 216,880 MWh, achieving a capacity factor of 23.9%. The balancing authority for the plant is NaturEner Power Watch, LLC (GWA), and it operates within the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
NaturEner Power Watch, LLC (GWA) (GWA)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
17.5K MWh
Latest Month
216.9K MWh
Annual Generation
23.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $196.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about NaturEner Glacier Wind Energy 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo