NaturEner Glacier Wind Energy 2 is a 104 MW Onshore Wind Turbine asset in Montana, currently Operating.
NaturEner Glacier Wind Energy 2 is reported in Montana since 2009 under NaturEner Glacier Wind Energy 2 LLC. Available operating and financial measures include 23.9% capacity factor and 217 GWh annual generation; $1895/kW reported CapEx.
- Location
- Toole, Montana
- Technology
- Onshore Wind Turbine
- Owner / parent
- NaturEner Glacier Wind Energy 2 LLC
- Operator
- NaturEner Glacier Wind Energy 2 LLC
- Grid
- NaturEner Power Watch, LLC (GWA)
- Plant ID
- 57050
What stands out
NaturEner Glacier Wind Energy 2 is a 104 MW Onshore Wind Turbine asset in Montana with status Operating.
Latest annual operating measures report 23.9% capacity factor and 217 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “Berkshire Hathaway Energy plans to buy 399 MW of Montana wind from NaturEner” (Utility Dive, 2022-08-03).
Market and operating context
- Balancing authority
- NaturEner Power Watch, LLC (GWA)
- NERC region
- WECC
- State rank
- #9 of 25
- National rank
- #690 of 1,442
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.