Search plants, projects, owners, and states
150 MW Wind operating in Dickens, TX
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
33.7676, -100.9885
County
Dickens, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Invenergy Services LLC | Invenergy | — |
| Owner(s) | Invenergy Services LLC | Invenergy LLC | — |
| Status | Operating | operating | — |
McAdoo Wind Energy LLC is a 150 MW wind power plant located in Dickens County, Texas. The plant began operating in 2008 and is owned and operated by Invenergy Services LLC. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Electric Reliability Council of Texas (ERCOT) grid, operating within the TRE NERC region.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 77 meters. The turbines were manufactured by GE Wind, model GE1.5-77. In its most recent year of operation, McAdoo Wind Energy generated 363,622 MWh of electricity, achieving a capacity factor of 27.6%. McAdoo Wind Energy ranks as the 164th largest wind farm in Texas out of 200, and 516th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
34.4K MWh
Latest Month
363.6K MWh
Annual Generation
27.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $284.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
McAdoo Wind Energy Substation · 138 kV
Substation Distance
< 10 km
Operator
Invenergy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
MWEC_G1
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.