Search plants, projects, owners, and states
2.2 MW Hydro operating in Franklin, WA
2.2 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1983
Operating Since
Coordinates
46.3784, -119.2545
County
Franklin, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Columbia Basin Hydropower | — | — |
| Owner(s) | East Columbia Basin Irr Dist, Quincy-Columbia Basin Irr Dist, South Columbia Basin Irr Dist | — | — |
| Status | Operating | — | — |
Eltopia Branch Canal 4.6 is a hydroelectric power plant located in Franklin County, Washington. The plant has a total capacity of 2.2 MW and began operating in 1983. It is owned and operated by Columbia Basin Hydropower. The facility utilizes a single generator and conventional hydroelectric technology, using water as its primary fuel source.
In the most recent year of data, Eltopia Branch Canal 4.6 generated 7,968 MWh of electricity, achieving a capacity factor of 41.1%. The plant operates within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Eltopia Branch Canal 4.6 ranks as the 65th largest out of 75 power plants in Washington, and 1192nd nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Latest Month
8.0K MWh
Annual Generation
41.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $5.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Eltopia Branch Canal 4.6Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo