Search plants, projects, owners, and states
150 MW Wind operating in Lincoln, MN
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
44.3011, -96.4114
County
Lincoln, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
MinnDakota Wind LLC is a 150 MW wind power plant located in Lincoln County, Minnesota. The plant, which began operating in 2008, utilizes onshore wind turbine technology. It consists of one generator and is owned by Avangrid, with Avangrid Power LLC as the operator. The facility uses GE1.5-77 wind turbines manufactured by GE Wind, with a rotor diameter of 77 meters and a hub height of 80 meters.
The plant's latest annual generation was 282,911 MWh, resulting in a capacity factor of 21.5%. MinnDakota Wind LLC operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. It is ranked as the 15th largest wind farm out of 26 in Minnesota, and 494th out of 734 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
28.3K MWh
Latest Month
282.9K MWh
Annual Generation
21.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $284.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.MNDAK.WND
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all articlesNo Ask reports yet for this entity.
Ask about MinnDakota Wind LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Avangrid extended its power purchase agreement with Xcel Energy for electricity from the 150 MW MinnDakota wind project in Lincoln County, MN.
source