107.2 MW Wind operating in Lincoln, MN
107.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1998
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
44.2917, -96.3750
Reference point reported to EIA.
County
Lincoln, MN
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
3 mapped line sections connect the two facilities over 17.570 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ALLETE Clean Energy | Avangrid Renewables | — |
| Owner(s) | ALLETE Clean Energy | Avangrid | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Lake Benton I is a 107.2 MW wind power plant located in Lincoln County, Minnesota. The plant began operating in 1998 and is owned by Avangrid, with ALLETE Clean Energy as the operator. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the MRO NERC region.
The plant's wind turbines have a hub height of 53 meters and a rotor diameter of 48 meters. The turbines were manufactured by Enron and are model Z48. In the most recent year of reported data, Lake Benton I generated 243,845 MWh of electricity, achieving a capacity factor of 25.9%. Lake Benton I ranks as the 18th largest wind farm in Minnesota out of 26, and 652nd nationally out of 734.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
20.9K MWh
Latest Month
243.8K MWh
Annual Generation
25.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $203.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Lake Benton Substation · 69 kV
Substation Distance
4.722 km
Operator
East River Electric Power Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.MNDAK.WND
Pricing Hub
MINN.HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.