84 MW Wind operating in Borden, TX
84 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2006
Operating Since
Coordinates
32.9537, -101.2197
County
Borden, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Red Canyon LLC | NextEra Energy | — |
| Owner(s) | FPL Energy Red Canyon LLC | NextEra Energy | — |
| Status | Operating | retired | — |
Post Wind Farm LP is an 84 MW wind power plant located in Borden County, Texas. The plant began operating in 2006 and is owned by NextEra Energy, with FPL Energy Red Canyon LLC as the operator. It consists of a single generator utilizing onshore wind turbine technology. The facility uses GE Wind GE1.5-87 turbines, which have a rotor diameter of 87 meters and a hub height of 80 meters.
The plant's latest annual generation was 314,763 MWh, resulting in a capacity factor of 42.7%. Post Wind Farm LP operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. According to available rankings, the plant is the 207th largest in Texas out of 245 plants, and the 789th largest nationally out of 1424 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
24.6K MWh
Latest Month
314.8K MWh
Annual Generation
42.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $159.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Red Canyon Wind Substation · 138 kV
Substation Distance
< 10 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
RDCAN-RDCNY1
Pricing Hub
HB_WEST
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.