2 MW Distillate Oil standby in Franklin, OH
2 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
2008
Operating Since
Coordinates
39.9524, -83.0144
County
Franklin, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Columbus - (OH) | — | — |
| Owner(s) | City of Columbus - (OH) | — | — |
| Status | Standby | — | — |
Dodge Park Engine No 1 is a 2 MW petroleum-fueled power plant located in Franklin County, Ohio. The plant began operating in 2008 and has one generator utilizing petroleum liquids technology. It is owned and operated by the City of Columbus, Ohio.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, Dodge Park Engine No 1 ranks 31st out of 38 power plants in Ohio and 739th out of 886 plants nationally. The latest annual generation data indicates an output of 1 MWh, resulting in a capacity factor of 0.0%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
14.4 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
1 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$765/kW
Est. Construction Cost
Total estimated cost: $1.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
VINE 138 KV QUASARLF
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Dodge Park Engine No 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.