2.8 MW Distillate Oil standby in Franklin, OH
2.8 MW
Nameplate Capacity
2
Generators
units
Petroleum Liquids
Technology
2006
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
39.9295, -83.0118
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Franklin, OH
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
5 mapped line sections connect the two facilities over 6.286 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Columbus - (OH) | — | — |
| Owner(s) | City of Columbus - (OH) | — | — |
| Status | Standby | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Renick Run Pumping Station 03-04 is a 2.8 MW petroleum-fueled power plant located in Franklin County, Ohio. The plant began operating in 2006 and is owned and operated by the City of Columbus. It consists of two generators utilizing petroleum liquids as their primary fuel source.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. According to state rankings, Renick Run Pumping Station 03-04 is the 28th largest of 38 petroleum-fueled plants in Ohio. Nationally, it ranks as the 679th largest of 886 similar plants.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
14.4 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
8820 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
168 lb/MWh
SO₂
16 lb/MWh
CH₄
0.357 lb/MWh
N₂O
0.071 lb/MWh
Capacity Factor
0.0%
Annual Net Gen
0 GWh
CO₂eq
8849 lb/MWh
Subregion
RFC West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $2.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Buckeye Steel Substation · 138 kV
Substation Distance
4.665 km
Operator
AEP Ohio
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
VINE 138 KV QUASARLF
Pricing Hub
AEP-DAYTON HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.