Query
Renick Run Pumping Station 03-04
Type
Entity Briefing
Entity
Renick Run Pumping Station 03-04
Generated
2026-10-10T09:50:32.453Z

Briefing on Renick Run Pumping Station 03-04

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
3 MW
Capacity
Standby
Current status
2006
Operating since
2
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantStandby

Renick Run Pumping Station 03-04 is a 3 MW Petroleum Liquids asset in PJM Interconnection, currently Standby.

Renick Run Pumping Station 03-04 is reported in Ohio since 2006 under City of Columbus - (OH). Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $765/kW reported CapEx.

Location
Franklin, Ohio
Technology
Petroleum Liquids
Owner / parent
City of Columbus - (OH)
Operator
City of Columbus - (OH)
Grid
PJM Interconnection
Plant ID
56420

What stands out

1

Renick Run Pumping Station 03-04 is a 3 MW Petroleum Liquids asset in Ohio with status Standby.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $765/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#26 of 36
National rank
#622 of 825

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.