114 MW Wind operating in Taylor, TX
114 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2005
Operating Since
Coordinates
32.3234, -100.0019
County
Taylor, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Callahan Wind, LLC | NextEra Energy | — |
| Owner(s) | FPL Energy Callahan Wind, LLC | NextEra Energy | — |
| Status | Operating | retired | — |
Callahan Divide Wind Energy Center is a 114 MW wind power plant located in Taylor County, Texas. The plant began operating in 2005 and is owned by NextEra Energy and operated by FPL Energy Callahan Wind, LLC. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 87 meters. The turbines were manufactured by GE Wind, model GE1.5-87. In the most recent year of data, the plant generated 414,319 MWh of electricity, achieving a capacity factor of 41.4%. Callahan Divide Wind Energy Center ranks 194th out of 200 wind plants in Texas and 631st out of 734 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
32.3K MWh
Latest Month
414.3K MWh
Annual Generation
41.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $216.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Callahan Divide Wind Substation · 138 kV
Substation Distance
4.497 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
CALLAHA_WND1
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.