82.5 MW Wind operating in Pecos, TX
82.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2001
Operating Since
Coordinates
30.9315, -102.2014
County
Pecos, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NWP Indian Mesa Wind Farm LP | NextEra Energy | NextEra Energy Resources |
| Owner(s) | Florida Power & Light Co | NextEra Energy | — |
| Status | Operating | retired | — |
Indian Mesa Wind Farm is a wind farm located in Pecos County, Texas. The farm consists of one hundred twenty-five Vestas V-47 660 kilowatt wind turbines that produce up to 82.5 megawatts of electricity. Electricity produced by the project is purchased by the Lower Colorado River Authority and TXU. The project is built on land owned by local ranches and the University of Texas. The project was completed in 2001 by Orion Energy LLC and development partner National Wind Power.
Read more on WikipediaNWP Indian Mesa Wind Farm is an 82.5 MW wind power plant located in Pecos County, Texas. The facility began operating in 2001 and is owned by NextEra Energy and operated by NWP Indian Mesa Wind Farm LP. The plant utilizes a single generator consisting of multiple onshore wind turbines. The wind turbines were manufactured by Gamesa, model G47-0.66, with a rotor diameter of 47 meters and a hub height of 50 meters.
The plant's latest annual generation was 205,620 MWh, achieving a capacity factor of 28.4%. NWP Indian Mesa Wind Farm operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. It ranks as the 208th largest power plant in Texas out of 245, and 790th nationally out of 1424. The plant is within the Texas Reliability Entity (TRE) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
15.7K MWh
Latest Month
205.6K MWh
Annual Generation
28.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $156.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Indian Mesa Wind Substation · 138 kV
Substation Distance
0 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
INDNNWP_RN
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.