35.7 MW Muni. Waste operating in Lancaster, PA
35.7 MW
Nameplate Capacity
1
Generators
unit
Municipal Solid Waste
Technology
1990
Operating Since
Coordinates
33.7596, -118.2402
County
Lancaster, PA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Covanta Lancaster Inc | Covanta Lancaster | — |
| Owner(s) | Lancaster County Solid WR Auth | Lancaster County Solid WR Authority | — |
| Status | Operating | operating | — |
Lancaster County Resource Recovery is a 35.7 MW waste-to-energy power plant located in Lancaster County, Pennsylvania. The plant, which began operating in 1990, utilizes municipal solid waste (MSW) as its primary fuel source. It is operated by Covanta Lancaster Inc and consists of a single generator. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
In the most recent year of reported data, Lancaster County Resource Recovery generated 178,455 MWh of electricity, achieving a capacity factor of 57.0%. Among similar MSW-fueled plants in Pennsylvania, it ranks as the 4th largest out of 6 facilities. Nationally, it holds the 28th position out of 56 MSW plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
17.4K MWh
Latest Month
178.5K MWh
Annual Generation
57.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2409 lb/MWh
NOx
6 lb/MWh
SO₂
3 lb/MWh
CH₄
2 lb/MWh
N₂O
0.202 lb/MWh
Capacity Factor
59.7%
Annual Net Gen
187 GWh
CO₂eq
2506 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $124.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
50608
Pricing Hub
WESTERN HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all 6 articlesNo Ask reports yet for this entity.
Ask about Lancaster County Resource RecoveryForward forecasts, scenario decomposition, and risk-decision tooling for this asset.