1616.1 MW Natural Gas operating in York, PA
1,616.1 MW
Nameplate Capacity
3
Generators
units
Natural Gas Steam Turbine
Technology
1961
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.0952, -76.6944
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
York, PA
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
13 mapped line sections connect the two facilities over 21.254 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Brunner Island LLC | Brunner Island | — |
| Owner(s) | Brunner Island LLC | Talen Energy | PPL |
| Status | Operating | — | — |
Brunner Island Steam Electric Station is a coal and natural gas-powered electrical generation facility in York County, Pennsylvania. It occupies most of the area of the eponymous island on Susquehanna River. The power plant has three major units, which came online in 1961, 1965, and 1969, with respective generating capacities of 334 MW, 390 MW, and 759 MW. In addition, three internal combustion generators were installed in 1967. Talen Energy will stop coal use at the plant in 2028.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Brunner Island is a 1616.1 MW natural gas power plant located in York County, Pennsylvania. The plant began operating in 1961 and is owned by Talen Energy, with Brunner Island LLC listed as the operator per EIA data. It consists of three generators utilizing natural gas steam turbine technology. Brunner Island operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
The plant's latest annual generation was 4,191,478 MWh, resulting in a capacity factor of 29.7%. Brunner Island is the 3rd largest power plant out of 35 in Pennsylvania, and ranks 51st out of 945 plants nationally. Recent news coverage includes 6 articles related to regulatory matters, 2 regarding hazards, and 1 covering industry topics.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
427.2K MWh
Latest Month
4.2M MWh
Annual Generation
29.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1367 lb/MWh
NOx
0.875 lb/MWh
SO₂
0.157 lb/MWh
CH₄
0.030 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
19.0%
Annual Net Gen
2685 GWh
CO₂eq
1368 lb/MWh
Subregion
RFC East
2013
$965/kW
Est. Construction Cost
Total estimated cost: $1.6B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
50581
Pricing Hub
WESTERN HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-07-10