Search plants, projects, owners, and states
48.2 MW Muni. Waste operating in Pasco, FL
48.2 MW
Nameplate Capacity
2
Generators
units
Municipal Solid Waste
Technology
1991
Operating Since
Coordinates
28.3681, -82.5583
County
Pasco, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pasco County - (FL) | County of Pasco (Florida) | — |
| Owner(s) | Pasco County | County of Pasco (Florida) | — |
| Status | Operating | operating | — |
The Pasco Cnty Solid Waste Resource Recovery facility is a 51.2 MW waste-to-energy plant located in Pasco County, Florida. The plant, which began operating in 1991, utilizes Municipal Solid Waste (MSW) as its primary fuel source and consists of two generators. It is owned and operated by the County of Pasco (Florida).
In the most recent year of reported data, the facility generated 180,606 MWh of electricity, achieving a capacity factor of 40.3%. The plant operates within the Progress Energy Florida balancing authority, in the SERC NERC region. Among similar MSW-fueled plants in Florida, the Pasco Cnty Solid Waste Resource Recovery facility ranks 6th out of 9 in terms of capacity, and nationally it ranks 18th out of 56.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Progress Energy Florida (FPC)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
17.5K MWh
Latest Month
180.6K MWh
Annual Generation
40.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2096 lb/MWh
NOx
7 lb/MWh
SO₂
3 lb/MWh
CH₄
1 lb/MWh
N₂O
0.176 lb/MWh
Capacity Factor
67.9%
Annual Net Gen
186 GWh
CO₂eq
2180 lb/MWh
Subregion
FRCC All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $168.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 7 articlesNo Ask reports yet for this entity.
Ask about Pasco Cnty Solid Waste Resource RecoveryForward forecasts, scenario decomposition, and risk-decision tooling for this asset.