Pasco Cnty Solid Waste Resource Recovery is a 48 MW Municipal Solid Waste asset in Florida, currently Operating.
Pasco Cnty Solid Waste Resource Recovery is reported in Florida since 1991 under County of Pasco (Florida). Available operating and financial measures include 40.3% capacity factor and 181 GWh annual generation; $3495/kW reported CapEx.
- Location
- Pasco, Florida
- Technology
- Municipal Solid Waste
- Owner / parent
- County of Pasco (Florida)
- Operator
- Pasco County - (FL)
- Grid
- Progress Energy Florida
- Plant ID
- 50666
What stands out
Pasco Cnty Solid Waste Resource Recovery is a 48 MW Municipal Solid Waste asset in Florida with status Operating.
Latest annual operating measures report 40.3% capacity factor and 181 GWh annual generation.
Available financial measures include $3495/kW CapEx.
Latest linked story: “Tampa's growth is fueling a $500 million plan to burn more garbage” (NBC News, 2023-10-31).
Market and operating context
- Balancing authority
- Progress Energy Florida
- NERC region
- SERC
- State rank
- #6 of 9
- National rank
- #19 of 55
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.