Search plants, projects, owners, and states
113.8 MW Black Liquor operating in Nez Perce, ID
113.8 MW
Nameplate Capacity
4
Generators
units
Wood/Wood Waste Biomass
Technology
1950
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
46.4231, -116.9764
Reference point reported to EIA.
County
Nez Perce, ID
No route with compatible recorded voltages was established. The alternatives remain available to review.
Mapped facilities are available to inspect, but no route is selected.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clearwater Paper Corporation | Clearwater Paper | — |
| Owner(s) | Clearwater Paper Corporation | Clearwater Paper | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Clearwater Paper IPP Lewiston is a 113.8 MW biomass power plant located in Nez Perce County, Idaho. The plant, which began operating in 1950, is owned and operated by Clearwater Paper Corporation. It utilizes wood and wood waste biomass (BLQ) as its primary fuel source and consists of 4 generators. The plant is the largest biomass facility in Idaho and ranks eighth nationally among biomass plants.
In the most recent year of data, the Clearwater Paper IPP Lewiston generated 462,919 MWh of electricity, achieving a capacity factor of 46.5%. The plant operates within the Western Electricity Coordinating Council (WECC) NERC region, and its balancing authority is Avista Corporation.
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Avista Corporation (AVA)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Connection evidence
Connection unresolved
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
42.0K MWh
Latest Month
462.9K MWh
Annual Generation
46.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
150 lb/MWh
NOx
0.825 lb/MWh
SO₂
2 lb/MWh
CH₄
0.118 lb/MWh
N₂O
0.029 lb/MWh
Capacity Factor
38.4%
Annual Net Gen
383 GWh
CO₂eq
161 lb/MWh
Subregion
WECC Northwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $397.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.