Search plants, projects, owners, and states
51.5 MW Wood Waste operating in Douglas, OR
51.5 MW
Nameplate Capacity
6
Generators
units
Wood/Wood Waste Biomass
Technology
1955
Operating Since
Coordinates
43.0895, -123.4156
County
Douglas, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Roseburg Forest Products Co | Roseburg Forest Products Co | — |
| Owner(s) | Roseburg Forest Products Co | RLC Industries | — |
| Status | Operating | operating | — |
The Dillard Complex is a 51.5 MW biomass power plant located in Douglas County, Oregon. The plant, which began operating in 1955, is owned by RLC Industries and operated by Roseburg Forest Products Co. It utilizes wood and wood waste as its primary fuel source, employing six generators using Wood/Wood Waste Biomass technology. The Dillard Complex is connected to the PacifiCorp - West balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, the Dillard Complex generated 114,025 MWh of electricity, achieving a capacity factor of 25.2%. The plant is ranked as the largest of 8 biomass facilities in Oregon, and 21st out of 97 such facilities nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - West (PACW)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10.6K MWh
Latest Month
114.0K MWh
Annual Generation
25.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
12 lb/MWh
NOx
2 lb/MWh
SO₂
0.173 lb/MWh
CH₄
0.483 lb/MWh
N₂O
0.063 lb/MWh
Capacity Factor
25.3%
Annual Net Gen
114 GWh
CO₂eq
42 lb/MWh
Subregion
WECC Northwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $180.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Dillard ComplexForward forecasts, scenario decomposition, and risk-decision tooling for this asset.