Search plants, projects, owners, and states
2.9 MW Hydro operating in Riverside, CA
2.9 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1983
Operating Since
Coordinates
33.8590, -117.6106
County
Riverside, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Metropolitan Water District of S CA | — | — |
| Owner(s) | Metropolitan Water District of S CA | — | — |
| Status | Operating | — | — |
The Corona hydroelectric plant is located in Riverside County, California. It is owned and operated by the Metropolitan Water District of Southern California. The plant has a total capacity of 2.9 MW from a single generator using conventional hydroelectric technology. It began operating in 1983.
Corona's latest annual generation was 14,485 MWh, resulting in a capacity factor of 56.7%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Corona is ranked as the 202nd largest power plant in California out of 247, and 1099th nationally out of 1464.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
1.5K MWh
Latest Month
14.5K MWh
Annual Generation
56.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $6.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Jefferson Substation · 66 kV
Substation Distance
0 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
MIRALOMA_6_N009
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about CoronaForward forecasts, scenario decomposition, and risk-decision tooling for this asset.