Query
Corona
Type
Entity Briefing
Entity
Corona
Generated
2026-10-17T12:11:13.035Z

Briefing on Corona

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
1983
Operating since
1
Generators
56.7%
Capacity factor
14 GWh
Annual generation
Briefing/plantOperating

Corona is a 3 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Corona is reported in California since 1983 under Metropolitan Water District of S CA. Available operating and financial measures include 56.7% capacity factor and 14 GWh annual generation; $2294/kW reported CapEx.

Location
Riverside, California
Technology
Conventional Hydroelectric
Owner / parent
Metropolitan Water District of S CA
Operator
Metropolitan Water District of S CA
Grid
CAISO (California)
Plant ID
480

What stands out

1

Corona is a 3 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 56.7% capacity factor and 14 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#203 of 247
National rank
#1094 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.