47.2 MW Wood Waste operating in Ashland, WI
47.2 MW
Nameplate Capacity
2
Generators
units
Wood/Wood Waste Biomass
Technology
1952
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
46.5866, -90.9020
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Ashland, WI
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 0.055 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Northern States Power Co - Minnesota | Northern States Power Co | — |
| Owner(s) | Northern States Power Co - Minnesota | Xcel Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Bay Front is a 47.2 MW hybrid power plant located in Ashland County, Wisconsin. The plant began operating in 1952 and is owned by Xcel Energy, with Northern States Power Co - Minnesota listed as the EIA operator. The plant utilizes both natural gas and wood/wood waste biomass as fuel sources, employing natural gas steam turbine technology. It consists of two generators.
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the MRO NERC region. In the most recent year with available data, Bay Front generated 160,344 MWh, achieving a capacity factor of 38.7%. According to available data, the installed cost per kW was $1,277.59. Bay Front is ranked 29th out of 35 power plants in Wisconsin and 1138th out of 1963 nationally.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
88.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
17.7K MWh
Latest Month
160.3K MWh
Annual Generation
38.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
363 lb/MWh
NOx
3 lb/MWh
SO₂
0.698 lb/MWh
CH₄
2 lb/MWh
N₂O
0.320 lb/MWh
Capacity Factor
37.5%
Annual Net Gen
155 GWh
CO₂eq
516 lb/MWh
Subregion
MRO West
Steam turbine · Northern States Power Company (Wisconsin) · Data from 2015–2024
$2,035/kW
Installed Cost
$23/kW
Annual CapEx
$68.0/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
NSP BAYFRNT BAYFRN_6_UNIT
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
MINN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-07-10
View all articlesNo Ask reports yet for this entity.
Ask about Bay FrontForward forecasts, scenario decomposition, and risk-decision tooling for this asset.