Search plants, projects, owners, and states
296.8 MW Hydro operating in Mecklenburg, VA
296.8 MW
Nameplate Capacity
9
Generators
units
Conventional Hydroelectric
Technology
1952
Operating Since
Coordinates
36.5994, -78.3005
County
Mecklenburg, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USCE-Wilmington District | US Army Corps of Engineers - Wilmington District | — |
| Owner(s) | USCE-Wilmington District | US Army Corps of Engineers - Wilmington District | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Army Corps of Engineers - Wilmington District
This entity is not yet in the GEM ownership database — chain unavailable.
John H. Kerr Dam is concrete gravity-dam located on the Roanoke River in Virginia, creating Kerr Lake. The dam was built by the U.S. Army Corps of Engineers between 1947 and 1953 for the purposes of flood control, and hydropower. The dam also serves wildlife resources, forest conservation, and public recreational uses. The John H. Kerr Dam currently produces over 426 GWh of electricity annually and has prevented over $385 million in flood damage since completion. The dam is named after John H. Kerr, a Congressman from North Carolina who was instrumental in authorizing the construction.
Read more on WikipediaThe John H Kerr hydroelectric plant is located in Mecklenburg County, Virginia. The plant has a total capacity of 296.8 MW across 9 generators, using conventional hydroelectric technology and water as its primary fuel source. It began operating in 1952 and is operated by USCE-Wilmington District. The plant is connected to the PJM Interconnection, LLC balancing authority and is within the SERC NERC region.
In the most recent year with available data, the John H Kerr plant generated 462,894 MWh of electricity, achieving a capacity factor of 17.7%. The plant is ranked 3rd out of 3 hydroelectric plants in Virginia and 72nd out of 194 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
18.1K MWh
Latest Month
462.9K MWh
Annual Generation
17.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $681.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Kerr Substation · 115 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
KERRDP 115KV TX1
Pricing Hub
DOMINION HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about John H KerrForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
A North Carolina county filed a formal application with USACE to reallocate water storage from Kerr Lake reservoir to meet growing municipal demand, triggering a public-comment regulatory process.
source