14.4 MW Muni. Waste operating in Washington, NY
14.4 MW
Nameplate Capacity
1
Generators
unit
Municipal Solid Waste
Technology
1991
Operating Since
Coordinates
43.3058, -73.5913
County
Washington, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wheelabrator Environmental Systems | Wheelabrator Environmental Systems Inc | — |
| Owner(s) | Wheelabrator Environmental Systems | Wheelabrator Technologies Holdings | WIN Waste Innovations |
| Status | Operating | operating | — |
Wheelabrator Hudson Falls is a 14.4 MW waste-to-energy power plant located in Washington County, New York. The plant began operating in 1991 and has one generator utilizing municipal solid waste (MSW) as its primary fuel. It is owned by Wheelabrator Technologies Holdings and operated by Wheelabrator Environmental Systems. The plant is connected to the New York Independent System Operator (NYISO) grid and falls within the North American Electric Reliability Corporation (NERC) NPCC region.
In the most recent year with available data, Wheelabrator Hudson Falls generated 59,791 MWh of electricity, achieving a capacity factor of 47.4%. The plant ranks seventh out of ten MSW plants in New York state and 46th out of 56 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
5.1K MWh
Latest Month
59.8K MWh
Annual Generation
47.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2570 lb/MWh
NOx
6 lb/MWh
SO₂
4 lb/MWh
CH₄
2 lb/MWh
N₂O
0.216 lb/MWh
Capacity Factor
49.8%
Annual Net Gen
63 GWh
CO₂eq
2673 lb/MWh
Subregion
NPCC Upstate NY
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $50.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
ADK RESOURCE___RCVRY
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
CAPITL
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 6 articlesNo Ask reports yet for this entity.