14 MW Muni. Waste operating in Gloucester, NJ
14 MW
Nameplate Capacity
1
Generators
unit
Municipal Solid Waste
Technology
1990
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
39.8733, -75.1378
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Gloucester, NJ
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
5 mapped line sections connect the two facilities over 2.246 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wheelabrator Environmental Systems | Wheelabrator Environmental Systems Inc | — |
| Owner(s) | Wheelabrator Environmental Systems | Wheelabrator Technologies Holdings | WIN Waste Innovations |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Wheelabrator Gloucester LP is a 14 MW waste-to-energy power plant located in Gloucester County, New Jersey. The plant began operating in 1990 and has one generator. It is owned by Wheelabrator Technologies Holdings and operated by Wheelabrator Environmental Systems. The primary fuel source for the plant is municipal solid waste (MSW).
In the most recent year of data, Wheelabrator Gloucester LP generated 84,510 MWh of electricity, achieving a capacity factor of 69.0%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Among MSW power plants in New Jersey, Wheelabrator Gloucester LP ranks 4th out of 4. Nationally, it ranks 48th out of 56 similar facilities.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
26.4 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
7.7K MWh
Latest Month
84.5K MWh
Annual Generation
69.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2492 lb/MWh
NOx
5 lb/MWh
SO₂
4 lb/MWh
CH₄
2 lb/MWh
N₂O
0.210 lb/MWh
Capacity Factor
65.4%
Annual Net Gen
80 GWh
CO₂eq
2593 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $48.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Eagle Point Substation · 230 kV
Substation Distance
1.806 km
Operator
Public Service Enterprise Group
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
EAGLEGEN13 KV EAGLEST2
Pricing Hub
WESTERN HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Wheelabrator Shasta
Data-driven briefing on Wheelabrator Technologies Holdings — fleet, generation, financial, and news signals.
Stem Solar
Data-driven briefing on Stem — fleet, generation, financial, and news signals.
Wheelabrator Westchester
Data-driven briefing on Wheelabrator Technologies Holdings — fleet, generation, financial, and news signals.
Wheelabrator Gloucester LP
Data-driven briefing on Wheelabrator Gloucester LP — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.