25 plants · 20.1 GW total capacity
Natural Gas generation in Alabama includes 25 plants with 20.1 GW total capacity.
Largest is Barry (3344 MW Natural Gas); oldest active is Barry (1954); newest is Lowman Energy Center (2023); top owner is Southern (10 plants).