Search plants, projects, owners, and states
3.8 MW Other Gas operating in Jefferson, AL
3.8 MW
Nameplate Capacity
1
Generators
unit
Other Gases
Technology
1997
Operating Since
Coordinates
33.5828, -86.7799
County
Jefferson, AL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ABC Coke - Drummond Co, Inc | — | — |
| Owner(s) | ABC Coke - Drummond Co, Inc | — | — |
| Status | Operating | — | — |
ABC Coke is a 3.8 MW power plant located in Jefferson County, Alabama. The plant began operating in 1997 and is owned and operated by ABC Coke - Drummond Co, Inc. The primary fuel source for electricity generation is other gases (OG). The plant consists of a single generator utilizing this fuel source.
In terms of grid context, ABC Coke operates within the balancing authority of Southern Company Services, Inc. - Trans, and is situated in the SERC NERC region. The plant's latest annual generation was 9 MWh, resulting in a capacity factor of 0.0%. ABC Coke holds the rank of 1 out of 1 among similar plants in Alabama and is ranked 19 out of 21 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southern Company Services, Inc. - Trans (SOCO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1 MWh
Latest Month
9 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
641 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
0.557 lb/MWh
SO₂
0.002 lb/MWh
CH₄
0.012 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
0.2%
Annual Net Gen
0 GWh
CO₂eq
642 lb/MWh
Subregion
SERC South
No financial data available for this plant.
This is the open data foundation underneath InfraSure's analytical layer — if you have sources or want more coverage here, drop a note.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about ABC CokeForward forecasts, scenario decomposition, and risk-decision tooling for this asset.