Zeus Spade Wind is a 987 MW Wind+Battery project in Texas, currently active.
Spade Wind, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-03-20.
- Queue ID
- ERCOT-26INR0386
- Location
- Mitchell, Texas
- Technology
- Wind+Battery
- Developer
- Spade Wind, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek
What stands out
1
Zeus Spade Wind is a 987 MW Wind+Battery project in Texas with status active.
2
Spade Wind, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-03-20.
Market and operating context
- Queue date
- 2024-03-29
- Proposed COD
- 2027-03-20
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.