Queue ID
ERCOT-26INR0386
Capacity
987.3 MW
Technology
Wind+Battery
Status
active
Location
Mitchell, TX
Region
ERCOT
Developer
Spade Wind, LLC
IA Status
Facility Study

Zeus Spade Wind

ERCOT-26INR0386BetaActiveWindBatteryERCOTLBNL + Live

987.3 MW hybrid in Mitchell, TX · In queue since March 2024 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

987.3 MW

Capacity

1

Components

Wind

2y 8m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryMar 29, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-20

Queue history
26INR0386 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

1 time

Mar 2027 → Mar 2028

Net change

+12 months

first report to latest

Capacity

987 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 29, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 20, 2028
From queue filing
Developer in saved assessment
Spade Wind, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA date. The ercotqueue.com label 'Construction' is not supported by any other source.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0386
  2. ercotqueue.com/project/26INR0386
  3. cleanview.co/planned-wind-projects/new-york/26INR0386/zeus-spade-wind-
  4. docketalarm.com/cases/Texas_State_Supreme_Court/22-1156/IN_RE_ZEUS_RENEWABLE_ENERGY_DEVELOPMENT_LLC_SPADE_WIND_I_LLC_SPADE_WIND_II_LLC_AND_SPADE_WIND_III_LLC/
  5. app.nrgmap.com/queues/ercot-26inr0386

Commercial operation date: No developer press release or financing-backed target exists. interconnection.fyi's full text lists a proposed completion date of March 20, 2028, matching LBNL, but its snippet and a Cleanview page say March 2027. Those aggregators appear to re-publish queue data, so they are not independent confirmation of a different date.

Developer: Every aggregator (interconnection.fyi, ercotqueue.com) repeats the LBNL filing entity, Spade Wind, LLC. A Texas Supreme Court docket links Zeus Renewable Energy Development, LLC with Spade Wind I/II/III LLCs, which suggests a possible parent. The docket does not name this exact entity or project, so the parent is not asserted.

Status: LBNL shows active status with a Facility Study IA status and no executed IA. NRG Map also lists it as active. No permit, groundbreaking or financing evidence supports construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Zeus Spade Wind is a proposed hybrid wind and battery storage development project in Mitchell County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Spade Wind, LLC, the project has a total proposed capacity of 987.3 MW. Its component data lists a wind capacity of 987.3 MW. The project also includes a battery storage element, though no separate capacity is specified for it in the available data.

The project is listed in the ERCOT interconnection queue under queue ID ERCOT-26INR0386 and entered the queue on March 29, 2024. Its status is active, and its interconnection process is at the Facility Study stage. The proposed point of interconnection is a tap on the 345 kV line between the Morgan Creek (1030) and Gasconades Creek (76030) substations. The project's proposed commercial operation date is March 20, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Mitchell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Spade Wind, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.