Query
Zeus Scurry Solar
Type
Entity Briefing
Entity
Zeus Scurry Solar
Generated
2026-10-19T20:56:20.051Z

Briefing on Zeus Scurry Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
504 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-10-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Zeus Scurry Solar is a 504 MW Solar+Battery project in Texas, currently active.

Scurry Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-01.

Queue ID
ERCOT-27INR0529
Location
Scurry, Texas
Technology
Solar+Battery
Developer
Scurry Solar, LLC
Market / region
ERCOT
Point of interconnection
MHOS 345 kV Substation (#59911)

What stands out

1

Zeus Scurry Solar is a 504 MW Solar+Battery project in Texas with status active.

2

Scurry Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-10-01.

Market and operating context

Queue date
2025-06-03
Proposed COD
2028-10-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Zeus Scurry Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0529
LocationScurry, Texas
TechnologySolar+Battery
DeveloperScurry Solar, LLC
Market / regionERCOT
Point of interconnectionMHOS 345 kV Substation (#59911)
Queue date2025-06-03
Proposed COD2028-10-01