Zeus Scurry Solar (ERCOT-27INR0529) — Project Summary

Queue ID
ERCOT-27INR0529
Capacity
503.54 MW
Technology
Solar+Battery
Status
active
Location
Scurry, TX
Region
ERCOT
Developer
Scurry Solar, LLC
IA Status
Facility Study

Zeus Scurry Solar

ERCOT-27INR0529BetaActiveSolarBatteryERCOTLBNL + Live

503.54 MW hybrid in Scurry, TX · In queue since June 2025 · Proposed COD October 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

503.54 MW

Capacity

1

Components

Solar

1y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 4m

Facilities Study50%
Queue EntryJun 3, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-01

Queue history
27INR0529 · 17 monthly ERCOT reports, May 2025 – Sep 2026

Projected COD moved

1 time

Jul 2027 → Oct 2028

Net change

+15 months

first report to latest

Capacity

504 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 3, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 1, 2028
From queue filing
Developer in saved assessment
Scurry Solar, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. ercotqueue.com lists 'No IA' and a 2% build-chance. A companion Zeus Scurry BESS (27INR0535, ~1,043 MW) is co-located in the same county.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-27inr0529
  2. ercotqueue.com/project/27INR0529
  3. cleanview.co/power-projects/planned/solar-farms/texas/27INR0529/zeus-scurry-solar
  4. quicksandcheck.com/texas/scurry-county/

Commercial operation date: Only the LBNL proposed COD of 2028-10-01 exists. Cleanview, interconnection.fyi and Quicksand Check show 2028 / Oct 2028, but these appear to mirror the ERCOT queue data and are not independent developer-backed signals.

Developer: All sources name Scurry Solar, LLC, which is the queue filing entity. No press release or news item identifies a parent or operating company behind the 'Zeus' project name.

Status: LBNL shows active status with a Facility Study IA status and no IA date. Tracker sites (interconnection.fyi, ercotqueue.com, parcelandgrid) confirm active, in-study status. No evidence of construction or withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Zeus Scurry Solar project is a proposed 503.54 MW solar generation project located in Scurry County, Texas. Developed by Scurry Solar, LLC, the project consists of photovoltaic solar technology and is interconnected within the Electric Reliability Council of Texas (ERCOT) region. The project entered the ERCOT interconnection queue as entry 27INR0529 on June 3, 2025, with a proposed commercial operation date of October 1, 2028.

The point of interconnection for the Zeus Scurry Solar project is the MHOS 345 kV Substation (#59911). The project is currently listed as active in the interconnection queue. The Zeus Scurry Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Scurry

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Scurry Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

MHOS 345 kV Substation (#59911)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ANDMDSLR_ALL
POI Substation
Mhos Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.