Briefing/projectactive
Zeus Rusk BESS is a 209 MW Solar+Battery project in Texas, currently active.
Rusk BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-01.
- Queue ID
- ERCOT-25INR0591
- Location
- Rusk, Texas
- Technology
- Solar+Battery
- Developer
- Rusk BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 3109 Stryker to 3100 Martin Lake
What stands out
1
Zeus Rusk BESS is a 209 MW Solar+Battery project in Texas with status active.
2
Rusk BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-09-01.
Market and operating context
- Queue date
- 2024-04-09
- Proposed COD
- 2027-09-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.