Briefing/projectactive
Zeus Mitchell Solar is a 805 MW Solar+Battery project in Texas, currently active.
Mitchell Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-17.
- Queue ID
- ERCOT-25INR0588
- Location
- Mitchell, Texas
- Technology
- Solar+Battery
- Developer
- Mitchell Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02
What stands out
1
Zeus Mitchell Solar is a 805 MW Solar+Battery project in Texas with status active.
2
Mitchell Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-17.
Market and operating context
- Queue date
- 2024-03-22
- Proposed COD
- 2029-04-17
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.