Briefing on Zeus Mitchell Solar

Entity Briefing
Generated Sep 18, 2026·Dataset freshness not reported
805 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-04-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Zeus Mitchell Solar is a 805 MW Solar+Battery project in Texas, currently active.

Mitchell Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-17.

Queue ID
ERCOT-25INR0588
Location
Mitchell, Texas
Technology
Solar+Battery
Developer
Mitchell Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02

What stands out

1

Zeus Mitchell Solar is a 805 MW Solar+Battery project in Texas with status active.

2

Mitchell Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-17.

Market and operating context

Queue date
2024-03-22
Proposed COD
2029-04-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Zeus Mitchell Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0588
LocationMitchell, Texas
TechnologySolar+Battery
DeveloperMitchell Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02
Queue date2024-03-22
Proposed COD2029-04-17