Zeus Mitchell Solar (ERCOT-25INR0588) — Project Summary

Queue ID
ERCOT-25INR0588
Capacity
804.71 MW
Technology
Solar+Battery
Status
active
Location
Mitchell, TX
Region
ERCOT
Developer
Mitchell Solar, LLC
IA Status
Facility Study

Zeus Mitchell Solar

ERCOT-25INR0588BetaActiveSolarBatteryERCOTLBNL + Live

804.71 MW hybrid in Mitchell, TX · In queue since March 2024 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

804.71 MW

Capacity

1

Components

Solar

2y 8m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 1m

Facilities Study50%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-17

Queue history
25INR0588 · 16 monthly ERCOT reports, Jun 2025 – Sep 2026

Projected COD moved

1 time

Aug 2026 → Apr 2029

Net change

+32 months

first report to latest

Capacity

805 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 22, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 17, 2029
From queue filing
Developer in saved assessment
Mitchell Solar, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed; no public evidence of construction, permitting, or financing.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-25inr0588
  2. cleanview.co/planned-solar-projects/TX/25INR0588/zeus-mitchell-solar
  3. ercotqueue.com/project/25INR0588

Commercial operation date: The only COD signal is the ERCOT/LBNL proposed date of 2029-04-17. Cleanview and interconnection.fyi repeat it ("expected to come online in April 2029") but are queue-derived mirrors, not independent developer or news confirmation.

Developer: Every source lists Mitchell Solar, LLC, and all of them trace back to the queue filing. No press release or news item names a parent or operating company. The "Zeus" project name and the sibling "Zeus Mitchell BESS II, LLC" filing hint at a common sponsor, but that is unconfirmed.

Status: The queue record shows active status, Facility Study, and no IA date. ercotqueue.com's "Currently Construction" label conflicts with the Facility Study phase and the missing IA, so I treat it as an unreliable tracker label.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Zeus Mitchell Solar (queue ID ERCOT-25INR0588) is a proposed solar-plus-battery hybrid development project located in Mitchell County, Texas. The project is being developed by Mitchell Solar, LLC and has a total proposed capacity of 804.71 MW. Its technology mix includes solar and battery storage. The available component data lists a solar component of 804.71 MW, and no separate capacity figure is provided for the battery component.

The project is in the interconnection queue of the Electric Reliability Council of Texas (ERCOT). It entered the queue on March 22, 2024, and currently holds an active status. Its interconnection agreement process is at the Facility Study stage. The proposed point of interconnection is a tap on the 345 kV Ranger Camp (10049) to Prong Moss (10057) transmission lines, circuits #01 and #02. The project has a proposed commercial operation date of April 17, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Mitchell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mitchell Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Range Camp Sub

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.