Briefing on Zeus Mitchell BESS II

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
1 GW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-05-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Zeus Mitchell BESS II is a 1 GW Solar+Battery project in Texas, currently active.

Zeus Mitchell BESS II, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-01.

Queue ID
ERCOT-26INR0686
Location
Mitchell, Texas
Technology
Solar+Battery
Developer
Zeus Mitchell BESS II, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02

What stands out

1

Zeus Mitchell BESS II is a 1 GW Solar+Battery project in Texas with status active.

2

Zeus Mitchell BESS II, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-05-01.

Market and operating context

Queue date
2025-06-19
Proposed COD
2027-05-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Zeus Mitchell BESS II — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0686
LocationMitchell, Texas
TechnologySolar+Battery
DeveloperZeus Mitchell BESS II, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02
Queue date2025-06-19
Proposed COD2027-05-01