Zeus Mitchell BESS II
1,042.94 MW generation in Mitchell, TX · In queue since June 2025 · Proposed COD May 2027
1,042.94 MW
Capacity
1
Components
Battery
1y 5m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 11m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-05-01
Projected COD moved
0 times
May 2027 → May 2027
Net change
0 months
first report to latest
Capacity
1043 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-26inr0686
- ercotqueue.com/project/26INR0686
- ercotqueue.com/developer/zeus-mitchell-bess-ii-llc
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0686/zeus-mitchell-bess-ii
- interxdata.com/projects/zeus-mitchell-bess-ii-ercot-gis-report-26inr0686/
Commercial operation date: Only the LBNL/ERCOT queue date (proposed COD 2027-05-01) is available, and interconnection.fyi repeats it as 'May 1, 2027'. Cleanview's 'Expected online 2027' appears to be derived from the same queue data. No developer press release or news article gives an independent target. The project has no IA and is at the Facility Study stage, so the date is likely optimistic.
Developer: Every source (LBNL, ercotqueue.com, interconnection.fyi) lists only the project LLC. No source names a parent or operating company. The 'Zeus' naming suggests a sponsor family with sister projects, but none is identified.
Status: LBNL and interconnection.fyi both show the project as active, and ercotqueue.com reports 'No IA' with a 2% build-chance. The interxdata.com snippet calling it 'operational' contradicts LBNL (is_operational false) and has no corroboration, so I treated it as a data error.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Zeus Mitchell BESS II project is a proposed 1042.94 MW hybrid battery energy storage project located in Mitchell County, Texas. Developed by Zeus Mitchell BESS II, LLC, the project consists of battery storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0686, with a queue entry date of June 19, 2025, and a proposed commercial operation date of May 1, 2027.
The point of interconnection (POI) for the project is Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Mitchell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Zeus Mitchell BESS II, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Range Camp Sub
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.