Query
Zeus Armstrong Solar
Type
Entity Briefing
Entity
Zeus Armstrong Solar
Technology
solar
Generated
2026-08-06T01:47:41.825Z

Briefing on Zeus Armstrong Solar

Entity Briefing
Generated Aug 6, 2026·Dataset freshness not reported
504 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-04-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Zeus Armstrong Solar is a 504 MW Solar+Battery project in Texas, currently active.

Armstrong Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-17.

Queue ID
ERCOT-25INR0586
Location
Armstrong, Texas
Technology
Solar+Battery
Developer
Armstrong Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345KV 23900 AlLIBATES -23914 TULECNYN

What stands out

1

Zeus Armstrong Solar is a 504 MW Solar+Battery project in Texas with status active.

2

Armstrong Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-17.

Market and operating context

Queue date
2024-05-20
Proposed COD
2028-04-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Zeus Armstrong Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0586
LocationArmstrong, Texas
TechnologySolar+Battery
DeveloperArmstrong Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345KV 23900 AlLIBATES -23914 TULECNYN
Queue date2024-05-20
Proposed COD2028-04-17