Woodland Energy Storage is a 208 MW Battery project in Texas, currently active.
Woodland Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-10-01.
- Queue ID
- ERCOT-30INR0005
- Location
- Bosque, Texas
- Technology
- Battery
- Developer
- Woodland Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 68040 Kopperl Substation 345kV
What stands out
Woodland Energy Storage is a 208 MW Battery project in Texas with status active.
Woodland Energy Storage, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-10-01.
Latest linked story: “EPC Consortium to build Entergy Texas’ new, cleaner, more reliable power station” (Entergy, 2023-03-03).
Market and operating context
- Queue date
- 2023-12-18
- Proposed COD
- 2030-10-01
- IA status
- Facility Study
- Study phase
- Facility Study