Woodland Energy Storage (ERCOT-30INR0005) — Project Summary

Queue ID
ERCOT-30INR0005
Capacity
207.6 MW
Technology
Battery
Status
active
Location
Bosque, TX
Region
ERCOT
Developer
Woodland Energy Storage, LLC
IA Status
Facility Study

Woodland Energy Storage

ERCOT-30INR0005BetaActiveBatteryERCOTLBNL + Live

207.6 MW storage in Bosque, TX · In queue since December 2023 · Proposed COD October 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207.6 MW

Capacity

1

Components

Battery

2y 11m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 10m

Facilities Study50%
Queue EntryDec 18, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-10-01

Queue history
30INR0005 · 34 monthly ERCOT reports, Dec 2023 – Sep 2026

Projected COD moved

0 times

Oct 2030 → Oct 2030

Net change

0 months

first report to latest

Capacity

208 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 18, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 3y 8m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activityEPC awardedEntergy · 2023-03-03

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2030
From queue filing
Developer in saved assessment
Woodland Energy Storage, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL queue, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedDec 18, 2023Latest in this assessment

Entered ERCOT interconnection queue, Facility Study stage

cleanview.co
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/30INR0005/woodland-energy-storage
  2. interconnection.fyi/project/ercot-30inr0005
  3. renewablesinfo.org/project/ercot-30inr0005-woodland-energy-storage

Commercial operation date: LBNL queue filing shows proposed COD of 2030-10-01. No press releases, financing announcements, or developer statements found to validate or update this target. Third-party aggregators (Cleanview, interconnection.fyi) echo the LBNL date without independent confirmation.

Developer: Only source is the LBNL filing entity 'Woodland Energy Storage, LLC'. No press releases, corporate announcements, or ownership disclosures found. Unable to determine if this is a project SPV or an operating company.

Status: LBNL status is 'active' with IA status 'Facility Study'. No news coverage or developer announcements found to indicate progression beyond interconnection studies.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Woodland Energy Storage is a proposed 207.6 MW battery storage project in Bosque County, Texas. Developed by Woodland Energy Storage, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-30INR0005. The project entered the interconnection queue on December 18, 2023, and has a proposed commercial operation date of October 1, 2030. Its interconnection agreement status is currently in the Facility Study phase.

The Woodland Energy Storage project has been the subject of recent news coverage, with eight articles focusing on regulatory and grid-related aspects.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Bosque

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Woodland Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

68040 Kopperl Substation 345kV

Data Source

LBNL + Live

DeveloperEntergy TexasEntergy · 2023-03-03
EPC contractorEPC ConsortiumEntergy · 2023-03-03
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.